Login Register
Gallery CV1800 & CVMax Installs Ondablade's CV Max 16in impeller system - system build photos (for interest only, design not optimised)
Advanced Search
Mount with WebDAV RSS Feed for this Album View Latest Comments View Slideshow View Slideshow (Fullscreen)

CV1800 & CVMax Installs

1. Ondablade's... 2. Fred... 3. Free... 4. Chris... 5. Nick Bethard 6. Gary Radice 7. Rick's... ... 68. Pictures of...

Members

222 members

Ondablade's CV Max 16in impeller system - system build photos (for interest only, design not optimised)

Date: 11/08/2011
Owner: ian
Size: 35 items
nextlast
workshop ducting - gen view
 
 

workshop ducting - gen view

Used galvanised steel ducting

Date: 11/08/2011
Views: 199
drops to K3 saw
 
 

drops to K3 saw

160mm branch splits to 100mm for saw top guard, and 125mm for saw cabinet

Date: 11/08/2011
Views: 152
ceiling hole for cyclone
 
 

ceiling hole for cyclone

Blower is mounted on floor of loft above, cyclone drops through to sharpening area/office below

Date: 11/08/2011
Views: 142
cyclone in situ
 
 

cyclone in situ

This arrangement leaves room for tall chip drum

Date: 11/08/2011
Views: 150
forming cyclone inlet tube
 
 

forming cyclone inlet tube

Forming cyclone inlet tube

Date: 11/08/2011
Views: 152
inlet tube in cyclone top
 
 

inlet tube in cyclone top

Inlet tune in cyclone top

Date: 11/08/2011
Views: 147
cyclone ramp, test fit on blower inlet tube for marking of OD
 
 

cyclone ramp, test fit on blower inlet tube for marking of OD

Forming the ramp, marked OD up from ply disc/cyclone top

Date: 11/08/2011
Views: 160
brackets fixing ramp to cyclone body
 
 

brackets fixing ramp to cyclone body

Brackets fixing ramp to cyclone body. Sealed afterwards on OD with automotive polyurethane bonder.

Date: 11/08/2011
Views: 134
inlet chute before fitting to cyclone
 
 

inlet chute before fitting to cyclone

Inlet chute soldered up

Date: 11/08/2011
Views: 146
inlet chute in situ before soldering
 
 

inlet chute in situ before soldering

Inlet chute in situ before soldering

Date: 11/08/2011
Views: 141
inlet chute to cyclone body soldered joint
 
 

inlet chute to cyclone body soldered joint

Inlet chute soldered joint

Date: 11/08/2011
Views: 135
assembled cyclone
 
 

assembled cyclone

Assembled cyclone

Date: 11/08/2011
Views: 146
blower assembled on cyclone (inside view)
 
 

blower assembled on cyclone (inside view)

Part assembled blower on cyclone

Date: 11/08/2011
Views: 140
blower assembled on cyclone
 
 

blower assembled on cyclone

Blower and cyclone assembly

Date: 11/08/2011
Views: 155
blower exhaust transition
 
 

blower exhaust transition

Blower exhaust transition

Date: 11/08/2011
Views: 133
blower exh diversion valve
 
 

blower exh diversion valve

Blower exh outdoor/to filter diversion valve

Date: 11/08/2011
Views: 127
motor & blower assy
 
 

motor & blower assy

Motor & blower assembly

Date: 11/08/2011
Views: 131
header duct to cyclone connection
 
 

header duct to cyclone connection

Header to cyclone flex connection

Date: 11/08/2011
Views: 136
cyclone mounting 3:4 view
 
 

cyclone mounting 3:4 view

Cyclone mounting bracket

Date: 11/08/2011
Views: 119
cyclone assembled in mounting
 
 

cyclone assembled in mounting

Cyclone & blower assembled in mounting

Date: 11/08/2011
Views: 138
soft mounting
 
 

soft mounting

Soft mounting pads - delivered a significant silencing effect

Date: 11/08/2011
Views: 130
cartridge mount side el
 
 

cartridge mount side el

Filter cartridge mounting in cabinet, side view

Date: 11/08/2011
Views: 128
cartridge mount 3:4 view
 
 

cartridge mount 3:4 view

Filter cartridge mounting in cabinet, 3/4 view

Date: 11/08/2011
Views: 135
cabinet part built
 
 

cabinet part built

Filter cabinet part built

Date: 11/08/2011
Views: 129
nextlast
Page: 1 2
Powered by Gallery v2.2